BP105230 - 45 Cutlass
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP105230 - 45 Cutlass | |
|---|---|
| Neighbourhood: | Protection Island |
| Street Address: | 45 Cutlass |
| Type of Application: | Single / Two Family Dwelling |
| File Number: | BP105230 |
| Date Application Submitted: | September 25, 2002 |
| Application Description: |
add 164 sq. m living space and detached garage Added heating appliance - March 23, 2005 (T.N.) Covenant signed by applicant and bank - sent across to City Clerks office for signing - Dec. 05,02 Covenant sent to LTO for registration - Dec. 9, 2002. Cheque #102515 2002-Dec-11 - Covenant registered at LTO - ET139230 2006-Nov-09 - BP renewed - first inspection to be called by 2007-May-04; BP to be completed by 2008-Nov-09. No more than 1 year between inspections Physical File Scanned + attached Jul 3, 2009 db |
| Application Status: | COMPLETED |
| Permit Value: | $96,000.00 |
| Building Area: |
164.00 M2 1,765.28 ft2 |
| Issued Date: | December 05, 2002 |
| File Close Date: | February 10, 2009 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 45 CUTLASS LOOKOUT | R3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
COVENANT PREPARATION
type covenant, applicant to sign, city to notorize. Completed means that the covenant is ready to send to LTO. Completed status will create the task to track LTO registation |
COMPLETED |
|
COVENANT REGISTRATION
In progress = sent to LTO, Complete = Verification received. Upon receipt of Verification - go to property tab, comments. Enter the category DSD-Covenants, enter a description - date of registration, and what the covenant is for. |
COMPLETED |
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
|
CHIMNEY
To be inspected while all components and clearances are visable |
FAILED |
|
CHIMNEY
To be inspected while all components and clearances are visable |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
|
FINAL
Final approval as per requirements on plans. |
FAILED |
|
FINAL
Final approval as per requirements on plans. |
PASSED
2009-02-10 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)