BP105230 - 45 Cutlass

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP105230 - 45 Cutlass
Neighbourhood: Protection Island    
Street Address: 45 Cutlass
Type of Application: Single / Two Family Dwelling
File Number: BP105230
Date Application Submitted: September 25, 2002
Application Description: add 164 sq. m living space and detached garage
Added heating appliance - March 23, 2005 (T.N.)
Covenant signed by applicant and bank - sent across to City Clerks office for signing - Dec. 05,02

Covenant sent to LTO for registration - Dec. 9, 2002. Cheque #102515

2002-Dec-11 - Covenant registered at LTO - ET139230

2006-Nov-09 - BP renewed - first inspection to be called by 2007-May-04; BP to be completed by 2008-Nov-09. No more than 1 year between inspections

Physical File Scanned + attached Jul 3, 2009 db
Application Status: COMPLETED
Permit Value: $96,000.00
Building Area: 164.00 M2
1,765.28 ft2
Issued Date: December 05, 2002
File Close Date: February 10, 2009

Associated Properties

Address Zone More
45 CUTLASS LOOKOUT R3 Property Report

Process Steps

Task Status
COVENANT PREPARATION

type covenant, applicant to sign, city to notorize. Completed means that the covenant is ready to send to LTO. Completed status will create the task to track LTO registation

COMPLETED
COVENANT REGISTRATION

In progress = sent to LTO, Complete = Verification received. Upon receipt of Verification - go to property tab, comments. Enter the category DSD-Covenants, enter a description - date of registration, and what the covenant is for.

COMPLETED
FOOTING / FORMS

Inspection of forms prior to any concrete being poured

PASSED
PERIMETER DRAIN

For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering

PASSED
CHIMNEY

To be inspected while all components and clearances are visable

FAILED
CHIMNEY

To be inspected while all components and clearances are visable

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PARTIAL
FINAL

Final approval as per requirements on plans.

FAILED
FINAL

Final approval as per requirements on plans.

PASSED

2009-02-10

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.