BP105201 - 877 Bruce Ave
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP105201 - 877 Bruce Ave | |
|---|---|
| Neighbourhood: | Harewood |
| Street Address: | 877 Bruce Ave |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP105201 |
| Date Application Submitted: | September 16, 2002 |
| Application Description: |
New Group E, Convenience store 163.9 m2. Part 9 Building, sprinklered, Accessible washroom, single exit permitted. 1 hr FRR for south wall face. Apply minimum one layer of 5/8" type x gypsum board to inside wall. Existing canopy over new tanks. Reference FPB00167 and FPB00166 for Underground tank removal and installation. |
| Application Status: | COMPLETED |
| Permit Value: | $260,110.00 |
| Builder: | MID ISLAND CONSUMER SERVICES CO OP |
| Issued Date: | October 15, 2002 |
| File Close Date: | February 07, 2003 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 877 BRUCE AVENUE | CC2 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
FIRELINE
Fireline for the sprinkler system must be complete and visable for inspection. |
PARTIAL |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
FAILED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD |
PASSED
2003-02-07 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)