BP104926 - 6300 Hammond Bay Rd
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP104926 - 6300 Hammond Bay Rd | |
|---|---|
| Neighbourhood: | Dover |
| Street Address: | 6300 Hammond Bay Rd |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP104926 |
| Date Application Submitted: | July 05, 2002 |
| Application Description: |
RDN Addition - 605m2 total area x-reference BP105267 for the foundation permit. 2 storey addition, 1st storey 366m2, 2nd storey 239m2. Sprinklers added throughout existing building and new addition. Part 3, sprinklered , fire alarm, accessible, Group D, 2 storey building. Building classification =3.2.2.54. Building Area (BCBC) = 987m2. Total area = 1847m2 Combustible construction, 45min FRR/FS floor assemblies and 45 FRR for loadbearing supports and 45min FRR/FS for elevator machine room and shaft. Interconnected floor space between upper and lower floor meets 3.2.8.2.(6). Council and meeting rooms considered subsiduary occupancies to principle use. |
| Application Status: | COMPLETED |
| Permit Value: | $560,000.00 |
| Builder: | WINDLEY CONTRACTING LTD |
| Issued Date: | October 18, 2002 |
| File Close Date: | December 02, 2003 |
Process Steps
| Task | Status |
|---|---|
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
FAILED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PARTIAL |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2003-12-02 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.