BP104901 - 333 10th Street -- Drawings Scanned/Attached
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP104901 - 333 10th Street -- Drawings Scanned/Attached | |
|---|---|
| Neighbourhood: | Harewood |
| Street Address: | 333 10th Street -- Drawings Scanned/Attached |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP104901 |
| Date Application Submitted: | July 03, 2002 |
| Application Description: |
renewed permit bp108058 Part 3 Building, Sprinklered 3.2.2.72., Group F2, No fire alarm. Building area 675.85m2. Single tenant for Vancouver Island Recycling Centre Ltd. Old building destroyed by fire. Washroom is not accessible (Industrial Occupancy). paid for additional plumbing fixture Sep 29/03 |
| Application Status: | RETIRED |
| Permit Value: | $149,200.00 |
| Builder: | ROBERT BOYLE ARCHITECTURE INC |
| Issued Date: | August 15, 2002 |
| File Close Date: | November 15, 2005 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 333 TENTH STREET | I2 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
CANCELLED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
CANCELLED |
|
FIRELINE
Fireline for the sprinkler system must be complete and visable for inspection. |
CANCELLED |
|
FIRELINE
Fireline for the sprinkler system must be complete and visable for inspection. |
PASSED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
FAILED |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)