BP104345 - 1155 Selkirk Drive

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP104345 - 1155 Selkirk Drive
Neighbourhood: Westwood    
Street Address: 1155 Selkirk Drive
Type of Application: Locate Permit
File Number: BP104345
Date Application Submitted: January 28, 2002
Application Description: Relocate single family dwelling and create finished space below, slab, attached carport
Application Status: COMPLETED
Permit Value: $45,000.00
Building Area: 247.31 M2
2,662.02 ft2
Issued Date: January 16, 2003
File Close Date: December 10, 2004

Associated Properties

Address Zone More
1155 SELKIRK DRIVE R5 Property Report

Process Steps

Task Status
PRELIMINARY PLANNING APPROVAL

Approval from Planning

APPROVED
FOOTING/FORMS

Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite.

FAILED
FOOTING/FORMS

Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite.

PASSED
PERIMETER DRAIN

For Perimeter Drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

CANCELLED
PERIMETER DRAIN

For Perimeter Drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concete.

PASSED
STORM CONNECTION

Pipe connection must be visible for inspection.

PASSED
SANITARY CONNECTION

Pipe Connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe Connection must be visible for inspection.

PASSED
CHIMMEY

To be inspected while all components and clearances are visible.

PASSED
FRAMING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
LATERAL BRACING & SHEATHING

All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors.

PARTIAL
INTERIOR BRACED WALL PANELS

The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound.

PASSED
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.