BP104295 - 4870 Hammond Bay (Parent) P11 SL41-48 VIS4691

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP104295 - 4870 Hammond Bay (Parent) P11 SL41-48 VIS4691
Neighbourhood: North Slope    
Street Address: 4870 Hammond Bay (Parent) P11 SL41-48 VIS4691
Type of Application: Commercial / Multi / Industrial
File Number: BP104295
Date Application Submitted: January 08, 2002
Application Description: Two fourplexes
X-reference Bp104294 for the foundation permit.
New Sprinklered , Part 9, Fourplex (Type E), 3/4 hour FS/FRR Floors, exterior passageway support etc,. 45 min party wall, 50 STM.-
41 L 4832 Salmon Berry Way
42 L 4834 Salmon Berry Way
43 U 4830 Salmon Berry Way
44 U 4836 Salmon Berry Way
45 L 4842 Salmon Berry Way
46 L 4844 Salmon Berry Way
47 U 4840 Salmon Berry Way
48 U 4846 Salmon Berry Way
Application Status: COMPLETED
Permit Value: $380,800.00
Builder: HAMMOND BAY DEVELOPMENTS
Issued Date: February 21, 2003
File Close Date: July 23, 2003

Associated Properties

Address Zone More
4870 HAMMOND BAY ROAD R8 Property Report
4832 SALMON BERRY WAY R8 Property Report
4834 SALMON BERRY WAY R8 Property Report
4830 SALMON BERRY WAY R8 Property Report
4836 SALMON BERRY WAY R8 Property Report
4842 SALMON BERRY WAY R8 Property Report
4844 SALMON BERRY WAY R8 Property Report
4840 SALMON BERRY WAY R8 Property Report
4846 SALMON BERRY WAY R8 Property Report

Process Steps

Task Status
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

FAILED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

FAILED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PARTIAL
OCCUPANCY-OLD PASSED

2003-07-23

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.