BP104293 - 4870 Hammond Bay (Parent) P 8,9,10 SL37-40, VIS4691
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP104293 - 4870 Hammond Bay (Parent) P 8,9,10 SL37-40, VIS4691 | |
|---|---|
| Neighbourhood: | North Slope |
| Street Address: | 4870 Hammond Bay (Parent) P 8,9,10 SL37-40, VIS4691 |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP104293 |
| Date Application Submitted: | January 08, 2002 |
| Application Description: |
ensure HPO at pick up - 1 fourplex X-reference Bp104291 for the foundation permit. New Sprinklered , Part 9, Fourplex (Type E), 3/4 hour FS/FRR Floors, exterior passageway support etc,. 45 min party wall, 50 STM. 37 L 4825 Salmon Berry Way 38 L 4823 Salmon Berry Way 39 U 4827 Salmon Berry Way 40 U 4821 Salmon Berry Way |
| Application Status: | COMPLETED |
| Permit Value: | $190,400.00 |
| Builder: | HAMMOND BAY DEVELOPMENTS |
| Issued Date: | January 17, 2003 |
| File Close Date: | May 28, 2003 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 4870 HAMMOND BAY ROAD | R8 | Property Report |
| 4825 SALMON BERRY WAY | R8 | Property Report |
| 4823 SALMON BERRY WAY | R8 | Property Report |
| 4827 SALMON BERRY WAY | R8 | Property Report |
| 4821 SALMON BERRY WAY | R8 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
CANCELLED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD |
PASSED
2003-05-28 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)