BP104256 - 15 Wallace -- Drawings Scanned/Attached
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP104256 - 15 Wallace -- Drawings Scanned/Attached | |
|---|---|
| Neighbourhood: | Downtown/Old City |
| Street Address: | 15 Wallace -- Drawings Scanned/Attached |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP104256 |
| Date Application Submitted: | December 19, 2001 |
| Application Description: |
Tim Horton's - Part 3 Building , sprinklered with fire alarm system, Group A Division 2, Building area = 283 m2. Buliding Classification = 3.2.2.28, combustible construction, Occupant load 66. Accessible washroom to comply with 3.8. three exits provided. Provide accessible seating for 1% of the seating area. |
| Application Status: | COMPLETED |
| Permit Value: | $400,000.00 |
| Builder: | TDL GROUP LTD |
| Issued Date: | April 02, 2002 |
| File Close Date: | June 24, 2002 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 15 WALLACE STREET | DT3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
FIRELINE
Fireline for the sprinkler system must be complete and visable for inspection. |
PARTIAL |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
| OCCUPANCY-OLD | PARTIAL |
| OCCUPANCY-OLD |
PASSED
2002-06-24 |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)