BP104256 - 15 Wallace -- Drawings Scanned/Attached

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP104256 - 15 Wallace -- Drawings Scanned/Attached
Neighbourhood: Downtown/Old City    
Street Address: 15 Wallace -- Drawings Scanned/Attached
Type of Application: Commercial / Multi / Industrial
File Number: BP104256
Date Application Submitted: December 19, 2001
Application Description: Tim Horton's - Part 3 Building , sprinklered with fire alarm system,
Group A Division 2, Building area = 283 m2. Buliding Classification = 3.2.2.28, combustible construction, Occupant load 66. Accessible washroom to comply with 3.8. three exits provided. Provide accessible seating for 1% of the seating area.
Application Status: COMPLETED
Permit Value: $400,000.00
Builder: TDL GROUP LTD
Issued Date: April 02, 2002
File Close Date: June 24, 2002

Associated Properties

Address Zone More
15 WALLACE STREET DT3 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
FIRELINE

Fireline for the sprinkler system must be complete and visable for inspection.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

FAILED
PLUMBING FINAL-OLD

All fixtures must be in place.

FAILED
OCCUPANCY-OLD PARTIAL
OCCUPANCY-OLD PASSED

2002-06-24

FINAL-OLD

Final approval as per requirements on plans.

FAILED
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.