BP104146 - 260 Irwin Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP104146 - 260 Irwin Street | |
|---|---|
| Neighbourhood: | South End |
| Street Address: | 260 Irwin Street |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP104146 |
| Date Application Submitted: | November 06, 2001 |
| Application Description: |
Convert covered play area to staff area/meeting room, installing one exterior wall, adding plumbing and altering sprinkler system. |
| Application Status: | COMPLETED |
| Permit Value: | $18,000.00 |
| Builder: | THE BOARD OF EDUCATION OF SCHOOL DISTRICT NO 68 (NANAIMO-LADYSMITH) |
| Issued Date: | November 19, 2001 |
| File Close Date: | January 28, 2002 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 260 IRWIN STREET | CS1 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
CANCELLED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
CANCELLED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
CANCELLED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2002-01-28 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)