BP103676 - 6190 Strathcona - Phase 6 -- Drawings Scanned/Attached

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP103676 - 6190 Strathcona - Phase 6 -- Drawings Scanned/Attached
Neighbourhood: Rutherford    
Street Address: 6190 Strathcona - Phase 6 -- Drawings Scanned/Attached
Type of Application: Commercial / Multi / Industrial
File Number: BP103676
Date Application Submitted: June 06, 2001
Application Description: Foundation permit for Phase 6 only. X reference Bp103505 for the on-site servicing.
5 duplex foundations, Part 9 buildings.
Construction shall not proceed beyond the foundation stage until the building permit for the remainder is issued for this phase.
X reference Bp102773 and bp103505 for all the drawings and schedules for this permit.
Unit #54 -6151 Rosecroft Place,Unit #55 -6149 Rosecroft Place
Unit #56 -6147 Rosecroft Place,Unit #57 -6145 Rosecroft Place
Unit #58 -6143 Rosecroft Place,Unit #59 -6141 Rosecroft Place
Unit #60 -6140 Rosecroft Place,Unit #61 -6142 Rosecroft Place
Unit #62 -6144 Rosecroft Place,Unit #63 -6146 Rosecroft Place
Application Status: COMPLETED
Permit Value: $170,900.00
Builder: WINDLEY CONTRACTING LTD
Issued Date: June 12, 2001
File Close Date: April 29, 2002

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
FIRELINE

Fireline for the sprinkler system must be complete and visable for inspection.

PARTIAL
STORM CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2002-04-29

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.