| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP103676 |
| Date Application Submitted: | June 06, 2001 |
| Application Description: |
Foundation permit for Phase 6 only. X reference Bp103505 for the on-site servicing. 5 duplex foundations, Part 9 buildings. Construction shall not proceed beyond the foundation stage until the building permit for the remainder is issued for this phase. X reference Bp102773 and bp103505 for all the drawings and schedules for this permit. Unit #54 -6151 Rosecroft Place,Unit #55 -6149 Rosecroft Place Unit #56 -6147 Rosecroft Place,Unit #57 -6145 Rosecroft Place Unit #58 -6143 Rosecroft Place,Unit #59 -6141 Rosecroft Place Unit #60 -6140 Rosecroft Place,Unit #61 -6142 Rosecroft Place Unit #62 -6144 Rosecroft Place,Unit #63 -6146 Rosecroft Place |
| Application Status: | COMPLETED |
| Permit Value: | $170,900.00 |
| Builder: | WINDLEY CONTRACTING LTD |
| Issued Date: | June 12, 2001 |
| File Close Date: | April 29, 2002 |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
FIRELINE
Fireline for the sprinkler system must be complete and visable for inspection. |
PARTIAL |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2002-04-29 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)