BP103379 - 2030 Boxwood
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP103379 - 2030 Boxwood | |
|---|---|
| Neighbourhood: | Northfield |
| Street Address: | 2030 Boxwood |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP103379 |
| Date Application Submitted: | February 23, 2001 |
| Application Description: |
Phase 2 - X reference BP103425 for foundation permit. Addition to Existing building to create a industrial tenant unit. Existing building 365m2, New Addition=284m2. Building Area = 649m2 Part 3 Building, 3.2.2.71 - Sprinklered by bylaw- Combustible Construction No fire alarm required No rating for roof East wall - Exposed Building Face - 2hr FRR - 2 exits required 2 washrooms provided, 1 is an Accessible washroom. 45min FRR/FS for demising wall between units. Occupant Load based on warehouse = 10 persons. |
| Application Status: | COMPLETED |
| Permit Value: | $96,000.00 |
| Builder: | WINDLEY CONTRACTING LTD |
| Issued Date: | March 13, 2001 |
| File Close Date: | June 04, 2001 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 2030 BOXWOOD ROAD | I3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
CANCELLED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
| OCCUPANCY-OLD | FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2001-06-04 |
|
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)