BP103207 - 1804 Bowen
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP103207 - 1804 Bowen | |
|---|---|
| Neighbourhood: | Northfield |
| Street Address: | 1804 Bowen |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP103207 |
| Date Application Submitted: | December 05, 2000 |
| Application Description: |
Part 9 Building Approved for Group D- Medical (Shell) Office, Future permit for tenant improvement is required. Occupancy shall not be approved until the tenant improvement permit and the tower permit (103235) are complete. Building Area = 418.5 m2 main floor, 35 m2 basement. Sprinklered, combustible building, 45 minute fire resistance rating required at floor over basement and at rear wall, no rating at roof. 2 exits required. Foundation/ perimeter drain/Services completed under Bp045995. |
| Application Status: | COMPLETED |
| Permit Value: | $125,000.00 |
| Issued Date: | January 09, 2001 |
| File Close Date: | August 21, 2001 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 1804 BOWEN ROAD | COR3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
CANCELLED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
FAILED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PARTIAL |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2001-08-21 |
|
FINAL-OLD
Final approval as per requirements on plans. |
SCHEDULED |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)