BP102748 - 435 Terminal Ave -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP102748 - 435 Terminal Ave -- Scanned | |
|---|---|
| Neighbourhood: | Newcastle/Brechin |
| Street Address: | 435 Terminal Ave -- Scanned |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP102748 |
| Date Application Submitted: | June 09, 2000 |
| Application Description: |
Xreference bp102972 for the foundation permit. Part 9, Group E, One storey combustible sprinklered 234.67m2 building, for two future retail suites. Shell permit. Single exit for future units works for unsprinklered building. 2 H/C washrooms are part of this permit. Travel distance within future suite to exit door is 15m. South elevation is 2hr FRR noncombustible construction with non-combustible cladding (8" Concrete Block Wall) no windows. North Elevation is 1 hr FRR Combustible or noncombustible. |
| Application Status: | COMPLETED |
| Permit Value: | $120,000.00 |
| Builder: | GEORGE COBURN MASONRY |
| Issued Date: | October 19, 2000 |
| File Close Date: | June 29, 2001 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 435 TERMINAL AVENUE N | COR2 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
FAILED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
| OCCUPANCY-OLD | PARTIAL |
| OCCUPANCY-OLD | PARTIAL |
| OCCUPANCY-OLD | PARTIAL |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2001-06-29 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)