BP102507 - 5050 Uplands, Building C only. -- Drawings Scanned/Attached

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP102507 - 5050 Uplands, Building C only. -- Drawings Scanned/Attached
Neighbourhood: Rutherford    
Street Address: 5050 Uplands, Building C only. -- Drawings Scanned/Attached
Type of Application: Commercial / Multi / Industrial
File Number: BP102507
Date Application Submitted: March 03, 2000
Application Description: Parent address 5050 Uplands; Building C is 5050 Uplands. Phase 1, x ref foundation permit bp102527. Part 9 building. Office, one tenant. Group D occupancy. Total area=678m2. Main floor area=565m2 . Upper floor=113m2 . Sprinklered throughout including the attic, combustible construction. 45 min FRR/FS for the floors and all loadbearing supports. Exit facility from upper floor requires 45min FRR/FS rating. Single exit from upper floor areas meet code. East side of building is required to have a 45 min FRR for the exposing building face. Non-combustible plumbing is required for the entire system. Occupant load is 82. 2 female and 2 male washrooms and 1 toilet room provided is in compliance with code. A fire alarm systems will be installed. No rating is required for the roof system. Fire dampers and fire stop flaps to be in conformance with 9.10.13.13 and 9.10.13.4.

NOTE: $5000.00 in bonding has to be maintained for the art work in the plaza.
Application Status: COMPLETED
Permit Value: $450,000.00
Builder: NORED DEVELOPMENTS INC
Builder: J MILNER TRUCKING LTD
Issued Date: March 31, 2000
File Close Date: August 16, 2000

Process Steps

Task Status
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

FAILED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

CANCELLED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

CANCELLED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

FAILED
PLUMBING FINAL-OLD

All fixtures must be in place.

CANCELLED
PLUMBING FINAL-OLD

All fixtures must be in place.

PARTIAL
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2000-08-16

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.