BP102445 - 4551/4555 Uplands Drive -- Drawings Scanend/Attached

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP102445 - 4551/4555 Uplands Drive -- Drawings Scanend/Attached
Neighbourhood: Rutherford    
Street Address: 4551/4555 Uplands Drive -- Drawings Scanend/Attached
Type of Application: Commercial / Multi / Industrial
File Number: BP102445
Date Application Submitted: February 11, 2000
Application Description: Parent address: 4981 Songbird Place
New address 4555 Uplands CRU - A and 4551 Uplands CRU-B
Part 9 Building, Medical/Dental offices, Group D occupancy, Total area 467m2. Sprinklered throughout including crawl space, combustible construction, 45 min FRR/FS for the floors and all loadbearing supports. No FS or FRR is required between Group D occupancies, however a 45 min rating is required for the exits from the second floor. Single exit from upper floor areas meets code. Single exit from main floor areas meets code. No FRR for the Exposed building faces all are over 100%. Non- combustible plumbing is required for the entire system when the plumbing penetrates the 45min FS/FRR rated floor assembly. No rating required for the roof. Interconnected floor space in compliance with code. Fire dampers and Fire stop flaps in conformance with 9.10.13.13 and 9.10.13.14.

Application Status: COMPLETED
Permit Value: $258,000.00
Builder: WESTMARK CONSTRUCTION LTD
Issued Date: March 13, 2000
File Close Date: July 31, 2000

Associated Properties

Address Zone More
4555 UPLANDS DRIVE COR2 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
FIRELINE

Fireline for the sprinkler system must be complete and visable for inspection.

PARTIAL
FIRELINE

Fireline for the sprinkler system must be complete and visable for inspection.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

CANCELLED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
PLUMBING FINAL-OLD

All fixtures must be in place.

FAILED
OCCUPANCY-OLD PASSED

2000-07-31

FINAL-OLD

Final approval as per requirements on plans.

CANCELLED
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.