BP102435 - 305 Prideaux Street -- Drawings Scanned/Attached
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP102435 - 305 Prideaux Street -- Drawings Scanned/Attached | |
|---|---|
| Neighbourhood: | Downtown/Old City |
| Street Address: | 305 Prideaux Street -- Drawings Scanned/Attached |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP102435 |
| Date Application Submitted: | February 07, 2000 |
| Application Description: |
Kitchen addition to temple. 147 ft2 at first storey, 376 ft2 at basement (total 523 ft2). 3.2.2.28, one storey with basement, facing one street. Floor over basement requires 45 minute frr. South wall (2.44m from prop line) requires one hour frr and noncombustible cladding. added 3 handsinks 2000-10-05 |
| Application Status: | COMPLETED |
| Permit Value: | $15,000.00 |
| Issued Date: | March 01, 2000 |
| File Close Date: | May 13, 2002 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 305 PRIDEAUX STREET | DT8 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2002-05-13 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)