BP102420 - 6190 Strathcona Place -- Drawings Scanned/Attached
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP102420 - 6190 Strathcona Place -- Drawings Scanned/Attached | |
---|---|
Neighbourhood: | Rutherford |
Street Address: | 6190 Strathcona Place -- Drawings Scanned/Attached |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP102420 |
Date Application Submitted: | January 28, 2000 |
Application Description: |
FOUNDATION ONLY for PHASE 4 Parkwood Village. side-by-side, 3 duplexes, 1 fourplex (10 units) Units 32 - 41. All combustible, sprinklered, one-storey buildings. Part 9 - 1998 BC Building Code applies. Addresses are (units 32-37) 6120, 6122, 6124...6130 Bellflower Way. (Units 38 - 41) 6129, 6127, 6125, 6123 Bellflower Way. See BP 101704 for drawings, etc. See BP101900 for remainder of buildings in this phase. |
Application Status: | COMPLETED |
Permit Value: | $180,000.00 |
Builder: | WINDLEY CONTRACTING LTD |
Issued Date: | April 26, 2000 |
File Close Date: | May 28, 2001 |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
FAILED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2001-05-28 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.