BP102022 - 4870 Hammond Bay P4 - SL13-16 VIS4691
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP102022 - 4870 Hammond Bay P4 - SL13-16 VIS4691 | |
|---|---|
| Neighbourhood: | North Slope |
| Street Address: | 4870 Hammond Bay P4 - SL13-16 VIS4691 |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP102022 |
| Date Application Submitted: | September 14, 1999 |
| Application Description: |
Phase 4, NEW sprinklered, combustible FOURPLEX (Units 13-16, "D" type) Part 9, 1998 BC Building Code applies: 3/4 hour FRR floors, exterior passageway, supports. etc. Addresses are (counterclockwise from top left unit) 4880, 4882, 4884, 4886 Salmon Berry Way. See BP 101653 for plans. |
| Application Status: | COMPLETED |
| Permit Value: | $237,000.00 |
| Builder: | HAZELWOOD CONSTRUCTION SERVICES INC |
| Issued Date: | September 28, 1999 |
| File Close Date: | June 20, 2000 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 4870 HAMMOND BAY ROAD | R8 | Property Report |
| 4886 SALMON BERRY WAY | R8 | Property Report |
| 4882 SALMON BERRY WAY | R8 | Property Report |
| 4884 SALMON BERRY WAY | R8 | Property Report |
| 4880 SALMON BERRY WAY | R8 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
| OCCUPANCY-OLD | CANCELLED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD | PARTIAL |
| OCCUPANCY-OLD |
PASSED
2000-06-20 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)