BP101245 - 5775 Turner Road -- Bldg J -- Longwood Pub -- Drawings Scanned/Attached
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP101245 - 5775 Turner Road -- Bldg J -- Longwood Pub -- Drawings Scanned/Attached | |
|---|---|
| Neighbourhood: | Rutherford |
| Street Address: | 5775 Turner Road -- Bldg J -- Longwood Pub -- Drawings Scanned/Attached |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP101245 |
| Date Application Submitted: | December 23, 1998 |
| Application Description: | NEW 407 sq.m., three-storey, combustible, sprinklered, LONGWOOD PUB BUILDING (Bldg "J"). 103 seat restaurant on main level, 86 seat pub on 2nd level. 3.2.2.24. (group A2 Occup) 1998 BC Building Code applies: floors, mezz 1 hour FRR. equivalency report for non-combustible construction, fire rated glazing, single exit from 3rd floor by GHL and Associates |
| Application Status: | COMPLETED |
| Permit Value: | $990,000.00 |
| Builder: | INTERTECH CONSTRUCTION MANAGERS LTD |
| Issued Date: | October 13, 1999 |
| File Close Date: | May 01, 2000 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 5801 TURNER ROAD | CC3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FIRELINE
Fireline for the sprinkler system must be complete and visable for inspection. |
PASSED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
|
CHIMNEY
To be inspected while all components and clearances are visible. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
FAILED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
CANCELLED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2000-05-01 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)