BP100631 - 900 MAUGHAN RD - SCANNED

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP100631 - 900 MAUGHAN RD - SCANNED
Neighbourhood: Duke Point    
Street Address: 900 MAUGHAN RD - SCANNED
Type of Application: Commercial / Multi / Industrial
File Number: BP100631
Date Application Submitted: June 18, 1998
Application Description: New 38 x 55m (2118 sq m), sprinklered, combustible, one-storey, F2 occup FISH WASTE REDUCTION PROCESS BUILDING witrh 126 sq m mezz. 3.2.2.52 1992 BCBC applies - facing three streets, 3/4 hour FRR floors, mezz, roof, etc if combustible.
New 18 x 24m (643 sq m), sprinklered, combustible, F2 occup, one-storey with 63 sq m mezz, OFFICE/MAINTENANCE BUILDING. 3.2.2.51 applies - floors, walls 3/4 hour FRR or non-combustible.
New 18 x 30m, inground biofilter.
Application Status: COMPLETED
Permit Value: $3,000,000.00
Issued Date: September 11, 1998
File Close Date: August 10, 1999

Associated Properties

Address Zone More
900 MAUGHAN ROAD I4 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
FIRELINE

Fireline for the sprinkler system must be complete and visable for inspection.

FAILED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
STORM CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
WATER CONNECTION

Pipe and connection must be visible for inspection.

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

CANCELLED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

FAILED
PLUMBING FINAL-OLD

All fixtures must be in place.

PARTIAL
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
OCCUPANCY-OLD PARTIAL
OCCUPANCY-OLD CANCELLED
OCCUPANCY-OLD CANCELLED
OCCUPANCY-OLD CANCELLED
OCCUPANCY-OLD PASSED

1999-08-05

FINAL-OLD

Final approval as per requirements on plans.

FAILED
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.