BP100359 - 59 wharf
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP100359 - 59 wharf | |
|---|---|
| Neighbourhood: | Downtown/Old City |
| Street Address: | 59 wharf |
| Type of Application: | Leasehold Improvements |
| File Number: | BP100359 |
| Date Application Submitted: | April 02, 1998 |
| Application Description: | Complete and occupy Nanaimo Credit Union suite = 580 sq m main floor with interconnected 274 sq m 2nd storey in the southwest end of a two-storey, sprinklered, non-combustible building on existing parkade building. 3.2.2.22 of 1992 BCBC applies: 1 hour floors, mezz, roof, etc. |
| Application Status: | COMPLETED |
| Permit Value: | $625,000.00 |
| Building Area: |
854.00 M2 9,192.37 ft2 |
| Builder: | CROFT CONSTRUCTION LTD |
| Issued Date: | June 05, 1998 |
| File Close Date: | October 05, 1998 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 59 WHARF STREET | DT1 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
PARTIAL |
|
FINAL-OLD
Final Approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
1998-10-05 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)