Street Address: South Parkway Plaza - 1275 Island Hwy S. -- Drawings Scanned/Attached
Type of Application: Commercial / Multi / Industrial
File Number: BP100351
Date Application Submitted: April 01, 1998
Application Description: Foundation permit for Bldg "A" 15022 sq ft,one storey, retail building. (3.2.2.43);
Bldg "B" 14400 sq ft, one storey retail building (3.2.2.43)
(Bldg B foundation added to this permit on May 8, 1998)
Bldg "C" 2000 sq ft, one storey gas kiosk and detached 2808 sq ft gas pump canopy (part 9); and
Bldg "D" 2800 sq ft. restaurant (3.2.2.19)

Building B was not done under this permit x- reference bp103204 & bp103193 for the actual permit for building B
Application Status: COMPLETED
Permit Value: $70,000.00
Issued Date: April 29, 1998
File Close Date: December 14, 2000

Associated Properties

Address Zone More
1275 ISLAND HIGHWAY S CC3 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

CANCELLED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

CANCELLED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

CANCELLED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PARTIAL
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

CANCELLED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
FINAL-OLD

Final approval as per requirements on plans.

PARTIAL
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2000-12-14

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.