BP100127 - Attached garage with loft

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP100127 - Attached garage with loft
Neighbourhood: Diver Lake    
Street Address: Attached garage with loft
Type of Application: Garage / Carport Permit
File Number: BP100127
Date Application Submitted: January 15, 1998
Application Description: To construct a 28ft wide by 24ft deep double garage addition with partial loft and three piece bathroom to the left side of this single family dwelling.
Application Status: COMPLETED
Permit Value: $18,862.00
Building Area: 63.82 M2
686.95 ft2
Issued Date: February 09, 1998
File Close Date: February 02, 2000

Associated Properties

Address Zone More
2323 ROSSTOWN ROAD R5 Property Report

Process Steps

Task Status
LATERAL BRACING & SHEATHING

All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors.

COMPLETED
EXCAVATION

Excavation of soil, prior to placing forms.

PASSED
FOOTING/FORMS

Inspection of forms prior to any cement being poured . For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite.

FAILED
FOOTING/FORMS

Inspection of forms prior to any cement being poured . For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite.

CANCELLED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

FAILED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

PASSED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Pipe and connection must be visable for inspection.

PASSED
FRAMING

Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

CANCELLED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
PLUMBING FINAL

All fixtures must be in place.

CANCELLED
PLUMBING FINAL

All fixtures must be in place.

PASSED
FINAL-OLD

Final Approval as per requested on plans.

FAILED
FINAL-OLD

Final Approval as per requested on plans.

PASSED

2000-02-02

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.