BP100080 - 27/29 Commercial Street
Neighbourhood: Downtown/Old City    
Street Address: 27/29 Commercial Street
Type of Application: Commercial / Multi-Res Alteration
File Number: BP100080
Date Application Submitted: December 23, 1997
Application Description: Commercial Alteration (part 9)
Existing Building change of use on upper floor to residential
Entire building (Sprinklered)
Lower Floor - Retail -Group E
Upper Floor - 3 new Residential units - Group C
Major Occupancy separations: 2 hrs
Washrooms 1 for each dwelling unit
Washrooms for retail will be required as part of the future permit for the tenant improvements for the retail space.
Exits: 2hr FRR ... 2 required RE: 3.4.4.1
Emergency lighting required
Firewalls: 4 hrs existing ( Fire door required 3.0 hr existing)
Application Status: COMPLETED
Permit Value: $75,000.00
Building Area: 459.00 M2
4,940.63 ft2
Builder: ELLINS ARCHITECT INC
Issued Date: April 21, 1998
File Close Date: September 04, 1998

Associated Properties

Address Zone More
29 COMMERCIAL STREET DT1 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
FIRELINE

Fireline for the sprinkler system must be complete and visable for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

PASSED

1998-09-04

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.