BP100010 - 2350 Labieux Road - Mid Island Consumer Co-Op- Credit Union & Creduco Insurance

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP100010 - 2350 Labieux Road - Mid Island Consumer Co-Op- Credit Union & Creduco Insurance
Neighbourhood: Diver Lake    
Street Address: 2350 Labieux Road - Mid Island Consumer Co-Op- Credit Union & Creduco Insurance
Type of Application: Commercial / Multi / Industrial
File Number: BP100010
Date Application Submitted: November 26, 1997
Application Description: 544 S.M. on each floor of 2 storey sprinklered office building ( D occupancy) facing 2 streets. 3.2.2..39 of 1992 BCBC applies. Combustible construction permitted.45 min. FRR for floor, load bearing walls & columns. Roof does not require a rating. Occupant load for each floor is 56 persons. Fire alarm not required. Emergency lighting required as per 3.2.7.3.(!)(a)(b). Two (2) exits on each floor required as per Table 3.4.2.A. Minimum distance between exits is 9 meters as per 3.4.2.3..(1). Exits comply.

Address change to 2517 Bowen
Application Status: COMPLETED
Permit Value: $600,000.00
Issued Date: February 27, 1998
File Close Date: January 11, 1999

Associated Properties

Address Zone More
2517 BOWEN ROAD COR3 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
FIRELINE

Fireline for the sprinkler system must be complete and visable for inspection.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

CANCELLED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
OCCUPANCY-OLD PARTIAL
OCCUPANCY-OLD PASSED

1999-01-11

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.