BP100009 - Building Permit for SFD
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP100009 - Building Permit for SFD | |
---|---|
Neighbourhood: | University District |
Street Address: | Building Permit for SFD |
Type of Application: | Single / Two Family Dwelling |
File Number: | BP100009 |
Date Application Submitted: | November 28, 1997 |
Application Description: | 2 Storey - Lower Unfinished Except Entry & Laundry |
Application Status: | COMPLETED |
Permit Value: | $114,000.00 |
Building Area: |
212.00 M2 2,281.95 ft2 |
Issued Date: | December 16, 1997 |
File Close Date: | April 30, 1998 |
Associated Properties
Address | Zone | More |
---|---|---|
382 BLACK DIAMOND DRIVE | R5 | Property Report |
Process Steps
Task | Status |
---|---|
ENGINEERING SERVICES APPROVAL
Reciept of Engineering Services approval |
APPROVED |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
CANCELLED |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
CANCELLED |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
CANCELLED |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
SCHEDULED |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
SCHEDULED |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
SCHEDULED |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
PASSED |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place for inspection |
PASSED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
1998-04-30 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.