BP120583 - 6171 Strathcona Place - 6165 Strathcona (Parent)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP120583 - 6171 Strathcona Place - 6165 Strathcona (Parent) | |
---|---|
Neighbourhood: | Rutherford |
Street Address: | 6171 Strathcona Place - 6165 Strathcona (Parent) |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP120583 |
Date Application Submitted: | January 26, 2015 |
Application Description: |
(6171 Strathcona Place) Strata Phase #3 - Proposed Strata Lot # 8, Two storey,slab on grade, Single Family Dwelling. April 17, 2015 - REVISION: Change window sizes, relocate windows, delete window in great room. Revise ensuite bathroom layout. Change lateral bracing near ensuite bathroom. |
Application Status: | COMPLETED |
Permit Value: | $258,382.63 |
Builder: | ARLIN VENTURES |
Issued Date: | March 16, 2015 |
Completed Date: | September 30, 2015 |
Expiry Date: | March 16, 2017 |
Associated Properties
Address | Zone | More |
---|---|---|
6165 STRATHCONA PLACE | R8 | Property Report |
6171 STRATHCONA PLACE | R8 | Property Report |
6175 STRATHCONA PLACE | R8 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
FIRELINE
Fireline for the sprinkler system must be complete and visable for inspection. |
SCHEDULED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visable. |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
FAILED |
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
OCCUPANCY-OLD |
PASSED
2015-09-30 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.
-
Recreation & Parks
- Recreation Facilities & Schedules
- Parks & Trails
- Activity Guide
- Parks Events
- Register for a Program
- Parks, Recreation and Culture Community Recreation - Winter 2021
- Parks, Recreation and Culture Pool Activities - Winter 2021
- Parks, Recreation and Culture Arena Activities - Winter 2021
-
City Services
- Garbage & Recycling
- Home & Property
- Water & Sewage
- Emergency Services
- Online Services
- Cemetery Services
- City Services Directory
-
Property & Development
-
Building Permits
- Online Building Permit Application
- Building Permit Revision
-
Application for a Residential Building Permit
- Access (driveway) Permit
- Accessory Building Permit
- Alteration Permit
- Building Envelope Repair
- Carriage House
- Demolition Permit
- Fence or Retaining Wall Permit
- Geotechnical Reports
- Locate Permit
- New Construction Permit
- Plumbing or Services Permit
- Secondary Suite Permit
- Special Inspection Permit
- Swimming Pool Permit
- Woodstove Installation Info
- Green Home Initiatives
-
Apply for a Commercial Building Permit
- Access (driveway) Permit
- Commercial Alteration Permit
- Building Envelope Repair Permit
- Demolition Permit
- Fence or Retaining Wall Permit
- Geotechnical Reports
- Leasehold Improvement
- Locate Permit
- New Commercial Construction Permit
- Occupant Load Permit
- Signs Permit
- Special Inspection Permit
- Sprinkler Requirements
- Fees and Bonding
- Commercial Plumbing Permit
- Bylaws for Building
- Forms and Guidelines
- Book a Building Inspection
- Report Illegal Construction
- Request Building Plans
- Building Permit Statistics
- Permit Fee Calculator
- Building News and Alerts
- Development Applications
- What's Building in my Neighbourhood
- Community Planning and Land Use Bylaws
- NanaimoMap
- Rebates
- Engineering Survey
- Soil Removal and Depositing
-
Building Permits
- Transportation & Mobility
-
Culture & Environment
- Grants
- Awards
- Community and Social Service Programs
-
Environment and Sustainability
- Environmental Responsibility
- Climate Action
- Protection & Restoration of Natural Spaces
- Zero Waste and Energy Management
- City Energy Projects
- Watercourse Protection
- Burn It Smart
- Invasive Species
- Pesticide Use
- Realtor Energy Efficiency Program
- Green Fleet
- Buttertubs Marsh Conservation Area
- Nanaimo Estuary
- Ecosystems
- Heritage
- Poetry
- Culture
- Public Art
-
Your Government
- News & Events
-
City Council
- Contact Mayor and Council
- Council Meetings
- Council Policies
- Mayor's Office
- Council Initiatives
- Proclamations
- Bastion Lighting Requests
- City Bylaws
- Budget & Finance
- Elections
-
Boards & Committees
- Committee Meeting Summaries
- Understanding Council Committee Structures
- Advisory Committee on Accessibility and Inclusiveness
- Design Advisory Panel
- Economic Development Task Force
- Environment Committee
- Finance and Audit Committee
- Governance and Priorities Committee
- Health and Housing Task Force
- Mayor's Task Force on Recovery and Resilience
- Special District 68 Sports Field and Recreation Committee
- Departments & Contacts
- Careers
- Projects
- Document Library
- Tourism
- Maps & Data
- Freedom of Information
- Social Issues and Community Safety
- Doing Business
- Get Involved
- About Nanaimo