BP117518 - 10 Torkko Crescent
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP117518 - 10 Torkko Crescent | |
---|---|
Neighbourhood: | Chase River |
Street Address: | 10 Torkko Crescent |
Type of Application: | Garage / Carport Permit |
File Number: | BP117518 |
Date Application Submitted: | June 29, 2012 |
Application Description: |
To construct a 2 bay garage w/ plumbing roughed in for future bathroom and washing machine. Revision: Feb 18, 2014-- Permit being completed. Interior not being finished (no insulation and drywall), plumbing fixtures are roughed-in, no gutters or soffits are installed. A building permit will be required to complete the accessory building. |
Application Status: | COMPLETED |
Permit Value: | $39,757.92 |
Building Area: |
89.17 M2 959.82 ft2 |
Issued Date: | July 17, 2012 |
File Close Date: | February 18, 2014 |
Expiry Date: | July 17, 2014 |
Associated Properties
Address | Zone | More |
---|---|---|
10 TORKKO CRESCENT | R1 | Property Report |
Process Steps
Task | Status |
---|---|
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
COMPLETED |
FOOTING/FORMS
Inspection of forms prior to any cement being poured . For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
ROUGH IN PLUMBING
Pipe and connection must be visable for inspection. |
CANCELLED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
FINAL-OLD
Final Approval as per requested on plans. |
PASSED
2014-02-18 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.