BP117997 - 545 Haliburton -- Scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP117997 - 545 Haliburton -- Scanned
Neighbourhood: South End    
Street Address: 545 Haliburton -- Scanned
Type of Application: Commercial / Multi-Res Alteration
File Number: BP117997
Date Application Submitted: October 24, 2012
Application Description: Nanaimo Youth Services Association : 1st storey = 148.09 m2 , 2nd storey = 150 m2 , 3 rd storey = 124 m2 . Total area = 423 m2. Upgrade to existing rooming house. 15 sleeping rooms. Part 9 building , three storey building. Installing new sprinkler system to 13R, new fire alarm system , adding smoke detectors, new interior 45 min. FRR/FS between suites with a 45 min FRR/FS between residence suites and public corridor . 20 min suite doors and closer. New exterior exit stairway from second floor. plus new stairway to lowest level. Alternative compliance for heritage buildings applied to existing stairway to top floor, unprotected opening protection with sprinkler head adjacent to new exit stair. Interconnected floor space Repair to existing on east side of building.
Application Status: COMPLETED
Permit Value: $300,000.00
Building Area: 423.00 M2
4,553.13 ft2
Builder: TECTONICA MANAGEMENT INC
Issued Date: November 23, 2012
File Close Date: March 28, 2013

Associated Properties

Address Zone More
545 HALIBURTON STREET CC2 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
OCCUPANCY-OLD PASSED

2013-03-28

OCCUPANCY-OLD SCHEDULED
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

Help us improve our website

Don't include private or financial information in this form.

Collection and use of your personal information
Information collected on this form is done so under the general authority of the Community Charter and Freedom of Information and Protection of Privacy Act (FOIPPA), and is protected in accordance with FOIPPA.  Personal information will only be used by authorized staff to fulfill the purpose for which it was originally collected, or for a use consistent with that purpose. Questions about the collection of your personal information may be referred to the Legislative Services Department at (250) 755-4405, or via email at foi@nanaimo.ca.
Privacy Policy