BP129905 - 12 University Crescent (Parent Property: 900 Fifth Street) (Phase 1: Foundation Only Permit)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP129905 - 12 University Crescent (Parent Property: 900 Fifth Street) (Phase 1: Foundation Only Permit) | |
---|---|
Neighbourhood: | University District |
Street Address: | 12 University Crescent (Parent Property: 900 Fifth Street) (Phase 1: Foundation Only Permit) |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP129905 |
Date Application Submitted: | March 06, 2024 |
Application Description: |
Certified Professional Building Permit Process - Phase 1: Foundation only permit for levels 1-3 New construction of a 10 storey student residential housing building. Building Classification Group C 3.2.2.48-EMTC with Group C and Group A2 major occupancies and with subsidiary Group D, Group F-2 and Group F-3 occupancies. Building area 1059.58 m2. Sprinklered with Fire alarm system. Key FRR/FS: 2Hr non-combustible at stair/elev/shaft and other spaces, 2hr non-combustible floor at levels 1-4. 2hr EMTC at floor levels 5-10. 1hr at bedroom suites and corridors. Total GFA = 10,035.77m2. Alternative Solutions for: Interconnected floors at level 2 and 3, Exit exposure protection at NW stair, cafeteria exit and stair 3 exit path, Use of EMTC construction, Combustible piping at geo-exchange energy system and Omission of smoke dampers at residential floors. |
Application Status: | ACTIVE |
Permit Value: | $13,000,000.00 |
Builder: | KINETIC CONSTRUCTION LTD |
Issued Date: | October 09, 2024 |
Expiry Date: | October 09, 2026 |
Associated Properties
Address | Zone | More |
---|---|---|
900 FIFTH STREET | , , CS1 | Property Report |
Process Steps
Task | Status |
---|---|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.