BP125763 - 100 & 101 - 21 Nicol Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP125763 - 100 & 101 - 21 Nicol Street | |
---|---|
Neighbourhood: | South End |
Street Address: | 100 & 101 - 21 Nicol Street |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP125763 |
Date Application Submitted: | August 16, 2019 |
Application Description: |
Scope of work to include the renovation of store front facade and to create 2 CRU's (units #100 - 207.9m2 & #101 - 302.4m2) in existing Group E occupancy(retail building), 510.3 m2, unsprinklered, on partial basement with attached F-2 storage area. Additional work: the construction of demising walls FS/FRR 45 minutes., installing 3 unisex washrooms and one accessible washroom, removal and capping of existing plumbing fixtures as location/layout of new washrooms is being revised. 1.5 hrs FRR required between Group E and Group F2 (storage garage) occupancies. Existing building circa 1946, 8" block for exterior walls and wood interior partition walls, beams & roof assembly. Jun19, 2020 - Revision: changes to cladding, demising and washroom walls moved, windows added over entry doors, FRR revised. Jul 20, 2020 - Revision: raise floor height is some areas to make building accessible (ramp handout sent out with drawing to applicant) |
Application Status: | COMPLETED |
Permit Value: | $75,000.00 |
Issued Date: | February 04, 2020 |
File Close Date: | January 14, 2022 |
Expiry Date: | February 03, 2022 |
Associated Properties
Address | Zone | More |
---|---|---|
21 NICOL STREET | DT4 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
SCHEDULED |
FINAL
Final approval as per requirements on plans. |
FAILED |
FINAL
Final approval as per requirements on plans. |
PASSED
2022-01-14 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.