BP125369 - 302 - 6545 Portsmouth Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP125369 - 302 - 6545 Portsmouth Road | |
---|---|
Neighbourhood: | Dover |
Street Address: | 302 - 6545 Portsmouth Road |
Type of Application: | Leasehold Improvements |
File Number: | BP125369 |
Date Application Submitted: | March 26, 2019 |
Application Description: |
(Skin Care West) - Tenant improvement for 278.75 m2 Group D medical office. 1 hr. F/S FRR between suite and public corridor, suite is sprinklered with F/A system. Addition of 9 sinks, dishwasher in kitchen area, 3 pcs. bathroom w/shower and HWT. Part 9, 3 storey shell building, 519.19 m2, Group D occupancy. Sprinklered, F/A system, 1 hr F.R.R., F/S required between units to underside of roof sheathing. Stairwell bump out on West elevation is to be of noncombustible construction. Total area of all three floors 1557.57m2. REVISION: Aug 9/19 - Addition of a sink, R/O door opening revised, changes to corridor glazing and some minor layout changes. REVISION: Feb 18/20 - Revise sprinkler layout as per M1.01 |
Application Status: | COMPLETED |
Permit Value: | $178,000.00 |
Builder: | WESTMARK CONSTRUCTION LTD |
Issued Date: | June 03, 2019 |
File Close Date: | March 06, 2020 |
Expiry Date: | June 02, 2021 |
Associated Properties
Address | Zone | More |
---|---|---|
302 6545 PORTSMOUTH ROAD | CD6 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
APPROVAL-FIRE-OLD
Approval required prior to Occupancy |
COMPLETED |
OCCUPANCY-OLD |
PASSED
2020-03-06 |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.