BP124271 - 205-1808 Bowen Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP124271 - 205-1808 Bowen Road | |
---|---|
Neighbourhood: | Northfield |
Street Address: | 205-1808 Bowen Road |
Type of Application: | Leasehold Improvements |
File Number: | BP124271 |
Date Application Submitted: | March 27, 2018 |
Application Description: |
(Leasehold improvements) - Unit #205 (Heath Law LLP office), D occupancy of 246.19m2. Work includes combining suites #203 & #205, moving some interior partition walls, removing one washroom, changing toilet and sink fixtures in remaining washroom, no sprinkler changes proposed. No fire resistance rating required between suites or corridor on second floor. Reclassified under 2012 BCBC 3.2.2.67. Group E and D occupancies, Two storey, 1404m2, sprinklered with fire alarm, combustible or non-combustible construction. 45min. FRR for floor assemblies & supporting members, no roof rating required. Separate mens, womens and "Universal" washroom is available on upper floor for common use of suites within the building. Upper floor corridor is a required fire separation with no fire resistance rating. Building is of office use on 2nd floor and retail and office use on lower floor. |
Application Status: | COMPLETED |
Permit Value: | $65,000.00 |
Builder: | RETRO ENTERPRISES |
Issued Date: | July 16, 2018 |
File Close Date: | August 23, 2018 |
Expiry Date: | July 15, 2020 |
Associated Properties
Address | Zone | More |
---|---|---|
1808 BOWEN ROAD | COR3 | Property Report |
Process Steps
Task | Status |
---|---|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2018-08-23 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.