BP125059 - 219 - 4750 Rutherford Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP125059 - 219 - 4750 Rutherford Road | |
---|---|
Neighbourhood: | Rutherford |
Street Address: | 219 - 4750 Rutherford Road |
Type of Application: | Leasehold Improvements |
File Number: | BP125059 |
Date Application Submitted: | December 06, 2018 |
Application Description: |
Tenant improvement in unit 219 for (TD Auto Finance Call Centre) "D" office occupancy, 1135m2. Work includes 1 "universal" washroom, 2 multi-stall female & male washrooms, staff room sink, laundry tub and 1 sink in wellness room; interior walls for offices, training rooms, etc., sprinkler changes, skylights and other structural work, new t-bar & acoustic cloud & open ceiling. Fire separations with fire resistance ratings provided (not required - served by Public Corridors conforming to 3.3.1.4). Installed under BP124937 - wall between corridor and suite 2 hr fire separation, demising walls between this suite and existing North side suites is 2 hr FRR on unit 219 side. Demising wall 1 hr FRR between unit 229 and 219 on unit 219 side. Building Classification: Group E building, BCBC 2012, 3.2.2.62, noncombustible construction sprinklered with fire alarm. |
Application Status: | COMPLETED |
Permit Value: | $1,500,000.00 |
Builder: | CENTURY GROUP INC |
Issued Date: | March 29, 2019 |
File Close Date: | September 13, 2019 |
Expiry Date: | March 29, 2021 |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
CANCELLED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
APPROVAL-FIRE-OLD
Approval required prior to Occupancy |
COMPLETED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
CANCELLED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2019-09-13 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.