BP117599 - 605 Bowen -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP117599 - 605 Bowen -- Scanned | |
|---|---|
| Neighbourhood: | University District | 
| Street Address: | 605 Bowen -- Scanned | 
| Type of Application: | Commercial / Multi-Res Alteration | 
| File Number: | BP117599 | 
| Date Application Submitted: | July 24, 2012 | 
| Application Description: | Auto Check Automotive - structural upgrades. Raising roof on portion of building. Existing Part Nine building, Group F2, one storey , unsprinklered , no fire alarm, 440.5 m2 Occupant load = 14 persons. single tenancy, Repair garage and ancillary spaces (office reception area) meet 9.10..9.17. No changes on the southwest side of the building between gridline D and F. installing new universal toilet room and relocating existing washroom plus two new sinks. Raising the structure on Northeast section of building structural changes. new wall along northeast 2 hr FRR. Rear south wall 2 hr FRR (infilling existing window openings with concrete block) , installing new doors and windows and adding parapet to existing. Repairing and new installation of stucco. | 
| Application Status: | COMPLETED | 
| Permit Value: | $95,000.00 | 
| Building Area: | 
                        440.50 M2 4,741.50 ft2  | 
                
| Builder: | DOGWOOD MOUNTAIN HOMES LTD | 
| Issued Date: | August 27, 2012 | 
| File Close Date: | January 22, 2013 | 
Associated Properties
| Address | Zone | More | 
|---|---|---|
| 605 BOWEN ROAD | CC1 | Property Report | 
Process Steps
| Task | Status | 
|---|---|
| 
                                FOOTING/FORMS
                                     Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.  | 
                            PASSED | 
| 
                                PERIMETER DRAIN
                                     For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.  | 
                            PARTIAL | 
| 
                                PERIMETER DRAIN
                                     For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.  | 
                            PARTIAL | 
| 
                                STORM CONNECTION
                                     Pipe and connection must be visible for inspection.  | 
                            PASSED | 
| 
                                SANITARY CONNECTION
                                     Pipe and connection must be visible for inspection.  | 
                            PASSED | 
| 
                                PAPER/FLASHING/WATERPROOFING
                                     When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.  | 
                            PARTIAL | 
| 
                                ROUGH IN PLUMBING
                                     Rough in plumbing must be complete including potable water piping.  | 
                            PARTIAL | 
| 
                                ROUGH IN PLUMBING
                                     Rough in plumbing must be complete including potable water piping.  | 
                            PARTIAL | 
| 
                                FRAMING
                                     Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.  | 
                            PARTIAL | 
| 
                                INSULATION
                                     Insulation and vapour barrier to be complete prior to inspection.  | 
                            PARTIAL | 
| 
                                INSULATION
                                     Insulation and vapour barrier to be complete prior to inspection.  | 
                            PARTIAL | 
| 
                                INSULATION
                                     Insulation and vapour barrier to be complete prior to inspection.  | 
                            PASSED | 
| 
                                PLUMBING FINAL-OLD
                                     All fixtures must be in place.  | 
                            PARTIAL | 
| 
                                FINAL-OLD
                                     Final approval as per requirements on plans.  | 
                            FAILED | 
| 
                                FINAL-OLD
                                     Final approval as per requirements on plans.  | 
                            
                                PASSED
                                     2013-01-22  | 
                        
| Map | 
|---|
                          View in Google Earth (KML)
                     | 
                
            
            Disclaimer:
            
            The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
            Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
            The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
            
            The Information Provided within this website is for Informational Purposes Only.
            It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.
            
        

 View in Google Earth (KML)