BP119825 - 101 5800 Turner Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP119825 - 101 5800 Turner Road | |
---|---|
Neighbourhood: | Rutherford |
Street Address: | 101 5800 Turner Road |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP119825 |
Date Application Submitted: | June 04, 2014 |
Application Description: |
Quality Foods: Additions and Renovation. Principal major Occupancy Group E with subsiduary occupancy deli and seating area are integral part to the occupancy. Building classification: 3.2.2.65, Building area (by code) 2769 m2, Sprinklered , Fire Alarm. combustible construction. Adding new vestibule at front (south) side of building 43.2m2 and new addtion 387m2 at front (south)side of building for deli and seating. wall exposed to another wall requires 2 hr FRR . Renovation to existing washrooms and adding additional washrooms and one universal washroom. Interior renovation of the bakery deli areas. Kitchen exhaust hood changes. Alternative solutions by GHL for 3.2.3.5 and 3.2.3.6 Existing Building 1 built under BP044834= 2324 m2 (Quality Foods building) has with a 2 hr FRR for the exposed wall facing the adjacent building which also has a 2 hr FRR for the exposed wall face facing Quality foods. Existing mezzanines = 213.91 m2. ~ |
Application Status: | COMPLETED |
Permit Value: | $950,000.00 |
Builder: | DOYLE CONSTRUCTION |
Issued Date: | November 03, 2014 |
File Close Date: | February 23, 2017 |
Expiry Date: | November 03, 2016 |
Associated Properties
Address | Zone | More |
---|---|---|
5800 TURNER ROAD | CC3 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
CANCELLED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
CANCELLED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
PARTIAL |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2017-02-23 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.