The Midtown Gateway Project is transforming a legacy brownfield site impacted by past industrial activity into a revitalized neighbourhood gateway. It features new complete street transportation corridors, a new naturalized storm water wetland with public walking trails, and enhanced access to our premier recreation complex - Beban Park.
|
Category:
Engineering
|
Active
|
08/22/2022
|
12/31/2024
|
The Fifth Street Complete Street project aims to increase the safety and comfort for people who walk, bike, take transit, and drive along this corridor. This project will see the continuation of on-street cycling facilities between the Downtown Mobility Hub and Vancouver Island University Mobility Hub, which is the City's largest cycling destination. At this time, the construction of the corridor has been postponed, but the signalization of the Fifth Street and Bruce Avenue intersection was completed in December 2023.
|
Category:
Engineering
|
Active
|
|
|
A variety of small-scale mobility, accessibility, and safety improvements around the City.
|
Category:
Transportation
|
Active
|
09/01/2018
|
12/31/2020
|
This project is designed to enhance the safety and comfort of pedestrians, cyclists, transit riders, and drivers, while simultaneously carrying out utility upgrades that align with the planned improvements to the surface infrastructure.
|
Category:
Engineering
|
Active
|
|
|
To address the long-standing and increasingly unsustainable health, safety, environmental and operational shortcomings of the site in a fiscally responsible manner.
|
Category:
Facilities
|
Active
|
|
|
This page provides information about the policy project intended to encourage more adaptable and accessible housing units within the City of Nanaimo. Adaptable and Accessible housing refers to housing that accommodates all residents regardless of their abilities. An Accessible dwelling is designed to meet the needs of people with all abilities; an Adaptable dwelling is designed to be easily renovated to meet tenant or owner's changing accessibility needs.
|
Category:
Planning
|
Active
|
08/26/2021
|
01/01/2022
|
This page provides information about the policy project intended to encourage more multiple family-friendly housing units within the City of Nanaimo.
|
Category:
Planning
|
Active
|
08/26/2021
|
01/01/2023
|
Terminal Avenue is an important gateway to Nanaimo’s downtown core. Over a number of years, community consultation efforts have consistently highlighted the need for redevelopment along Terminal Avenue. Building off the “Terminal-Nicol Re-imagined”
document (a grassroots effort to develop a planning document to push forward the redevelopment of Terminal Avenue) the City is taking steps to create a cohesive vision for a vibrant, thriving downtown Nanaimo.
|
Category:
Engineering
|
Active
|
|
|
The Midtown Water Supply Project is an important multi-year / multi-phase major water infrastructure upgrade project that will serve the community for generations and will provide resiliency in the City's core water supply network.
|
Category:
Engineering
|
Active
|
03/12/2021
|
|
This art project explores and celebrates Bowen Park, inviting curiosity about the life and relationships in the park– plant, animal, and human.
|
Category:
Arts and Culture
|
Active
|
|
|