BP122642 - 5483 Mildmay Road

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP122642 - 5483 Mildmay Road
Neighbourhood: Pleasant Valley    
Street Address: 5483 Mildmay Road
Type of Application: Single / Two Family Alteration
File Number: BP122642
Date Application Submitted: October 31, 2016
Application Description: For construction of a second storey and adding a 3 car garage with bonus room

REVISION: 2017-JAN-13 Mainfloor bath layout, add ensuite and basement bathroom layout
REVISION: 2018-AUG-07 Change kitchen layout, add sink in garage, add 3 pc bathroom in basement, add 2/ 3 piece bathrooms on upper floor.
REVISION 2019-MAY-02 Deck addition/redesign.
REVISION 2021-APR

PERMIT RENEWAL 2019-JAN--07
Application Status: COMPLETED
Building Area: 222.22 M2
2,391.95 ft2
Issued Date: January 13, 2017
File Close Date: May 25, 2021
Expiry Date: January 13, 2021

Associated Properties

Address Zone More
5483 MILDMAY ROAD R1 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

FAILED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

CANCELLED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

FAILED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

PARTIAL
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

PARTIAL
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

PASSED
SANITARY CONNECTION

Pipe and Connection must be visible for inspection

PASSED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PARTIAL
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PARTIAL
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

CANCELLED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

CANCELLED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PARTIAL
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

CANCELLED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PARTIAL
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

FAILED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
FRAMING

Rough in plumbing & electrical must be complete.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

FAILED
FRAMING

Rough in plumbing & electrical must be complete.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

CANCELLED
FRAMING

Rough in plumbing & electrical must be complete.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

FAILED
FRAMING

Rough in plumbing & electrical must be complete.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection

CANCELLED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PASSED
FINAL

Final approval as per requirements on plans.

FAILED
FINAL

Final approval as per requirements on plans.

CANCELLED
FINAL

Final approval as per requirements on plans.

FAILED
FINAL

Final approval as per requirements on plans.

PASSED

2021-05-25

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

Help us improve our website

Don't include private or financial information in this form.

Collection and use of your personal information
Information collected on this form is done so under the general authority of the Community Charter and Freedom of Information and Protection of Privacy Act (FOIPPA), and is protected in accordance with FOIPPA.  Personal information will only be used by authorized staff to fulfill the purpose for which it was originally collected, or for a use consistent with that purpose. Questions about the collection of your personal information may be referred to the Legislative Services Department at (250) 755-4405, or via email at foi@nanaimo.ca.
Privacy Policy