BP121860 - 102 - 5170 Dunster Road

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP121860 - 102 - 5170 Dunster Road
Neighbourhood: Pleasant Valley    
Street Address: 102 - 5170 Dunster Road
Type of Application: Leasehold Improvements
File Number: BP121860
Date Application Submitted: April 12, 2016
Application Description: New Horizon Centre- (Group D) Unit 102- SL 2 - 181.3 m2 , Adding 45 min FPR door Ulc labelled with self door device in the existing 1 hour demising wall between SL# 103 & SL #102 . New plumbing , 4 treatment rooms each with new sinks, new staff room with sink, new washer and dryer. Open concept room with retractable curtains. Sprinkler changes to accommodate new rooms, emergency lighting required. 2 hr FRR/FS floor/ceiling assembly existing. Pot lights and bathroom fan not permitted to penetrate 2 hr FRR/FS.

REVISION OCT 13, 16 - Floor layout change to unit 102, no door between units 102 and 103.

Building Classification - Part 9, Building area = 483.6m2, 3-storey, sprinklered/fire alarm, combustible construction, non combustible plumbing, 1st floor, Group E/D = 483.6 m2., 2nd storey, Group C = 455m2, 3rd Storey, Group C = 287m2. 2 hr FRR/FS 50 STM between the 1st and 2nd storey E to C.
Application Status: COMPLETED
Permit Value: $45,000.00
Building Area: 271.70 M2
2,924.55 ft2
Builder: P S M MANAGEMENT LTD
Issued Date: April 15, 2016
File Close Date: March 03, 2017
Expiry Date: April 16, 2018

Associated Properties

Address Zone More
103   5170 DUNSTER ROAD CC1 Property Report
102   5170 DUNSTER ROAD CC1 Property Report
5170 DUNSTER ROAD CC1 Property Report

Process Steps

Task Status
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
FINAL-OLD

Final Approval as per requirements on plans.

CANCELLED
FINAL-OLD

Final Approval as per requirements on plans.

PARTIAL
FINAL-OLD

Final Approval as per requirements on plans.

PASSED

2017-03-03

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

Help us improve our website

Don't include private or financial information in this form.

Collection and use of your personal information
Information collected on this form is done so under the general authority of the Community Charter and Freedom of Information and Protection of Privacy Act (FOIPPA), and is protected in accordance with FOIPPA.  Personal information will only be used by authorized staff to fulfill the purpose for which it was originally collected, or for a use consistent with that purpose. Questions about the collection of your personal information may be referred to the Legislative Services Department at (250) 755-4405, or via email at foi@nanaimo.ca.
Privacy Policy